Traditional IP packet forwarding analyzes the ( )IP address contained in the network layer header of each packet as the packet travels from its source to its final destination. A router analyzes the destination IP address independently at each hop in the network. Dynamic ( )protocols or static configuration builds the database needed to analyze the destination IP address (the routing table).The process of implementing traditional IP routing also is called hop-by-hop destination-based ( )routing. Although successful,and obviously widely deployed,certain restrictions,which have been realized for some time,exist for this method of packet forwarding that diminish its ( ). New techniques are therefore required to address and expand the functionality of an IP-based network infrastructure.This first chapter concentrates on identifying these restrictions and presents a new archiecture,known as multiprotocol ( )switching,that provides solutions some of these restrictions.
问题1选项
A.datagram
B.destination
C.connection
D.service
问题2选项
A.routing
B.forwarding
C.transmission
D.management
问题3选项
A.anycast
B.muticast
C.broadcast
D.unicast
问题4选项
A.reliability
B.flexibility
C.stability
D.capability
问题5选项
A.cost
B.cast
C.mark
D.label
正确答案及解析
正确答案
解析
包含此试题的试卷
你可能感兴趣的试题
企业通过多年项目实施经验总结归纳出IT项目可能出现风险列表属于( )范畴。
-
- A.企业环境因素
- B.定性分析技术
- C.组织过程资产
- D.风险规划技术
- 查看答案
风险分析最简单方法是( )。
-
- A.概率分析
- B.敏感性分析
- C.德尔菲技术
- D.效用理论
- 查看答案
规划风险应对是针对项目目标,制订提高机会,降低威胁方案和措施过程。( )不是规划风险应对工具与技术。
-
- A.应急应对策略
- B.概率和影响矩阵
- C.专家判断
- D.消极风险或威胁应对策略
- 查看答案
在定性风险分析中,使用定性分析将风险发生概率及其后果描述为极高、高、中、低、极低5级,此种分析方法称为( )
-
- A.风险概率及影响评估
- B.风险数据质量评估
- C.风险分类
- D.风险数据收集
- 查看答案
下面( )不是风险审计目标。
-
- A.确定风险管理已经在项目整个生命周期中实施
- B.确定项目被管理好,风险被控制
- C.协助在早期阶段鉴别项目价值潜力退化
- D.确保被识别和相当有威胁每一个风险都有计算预期值
- 查看答案