Border Gateway Protocol(BGP) is inter-autonomous system( )protocol. BGP is based on a routing method called path vector routing. Distance vector routing is not a good candidate for inter-autonomous system routing because there are occasions on which the route with the smallest ( )count is not the preferred route. For example, we may not want a packet through an not secure even though it is the shortest route. Also, distance vector routing is unstable due to the fact that the routers announce only the number of hop counts to the destination without actually defining the path that leads to that( ).A router that receives a distance vector advertisement packet may be fooled if the shortest path is actually calculated through the receiving router itself. Link( )routing is also not a good candidate for inter-autonomous system routing because an Internet is usually too big for this routing method. To use link state routing for the whole internet would require each router to have a huge link state database. It would also take a long time for each router to calculate its rousting ( )using the Dijkstra algorism.
问题1选项
A.routing
B.switching
C.transmitting
D.receiving
问题2选项
A.path
B.hop
C.route
D.packet
问题3选项
A.connection
B.window
C.source
D.destination
问题4选项
A.status
B.search
C.state
D.research
问题5选项
A.table
B.state
C.metric
D.cost
正确答案及解析
正确答案
解析
包含此试题的试卷
你可能感兴趣的试题
Advancements in ( )have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.
-
- A.Artificial Intelligence
- B.Cloud Computing
- C.Internet of Things
- D.Big Data
- 查看答案
In project human resource management , ( )is not a source of power for the project manager.
-
- A.referent power
- B.expert power
- C.reward power
- D.audit power
- 查看答案
At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , ( ), operation environment feasibility analysis and other aspects of feasibility analysis.
-
- A.detail feasibility analysis
- B.opportunity analysis
- C.economic feasibility analysis
- D.risk analysis
- 查看答案
( )is a grid that shows the project resources assigned to each work package.
-
- A.Stakeholder engagement assessment matrix
- B.Requirements traceability matrix
- C.Probability and impact matrix
- D.Responsibility assignment matrix
- 查看答案
Xinhua News Agency reported in January 2022,Chian will further promote the developmet of a digital economy during the 14th Five-Year Plan eriod(2021-2025). The plan also emphasized industrial ( )transformation.
-
- A.digital
- B.networking
- C.intelligentize
- D.informatization
- 查看答案