某公司的网络拓扑如图4-1所示,随着业务的发展,接待区wifi的接入设备过多,导致掉线不稳定。网络管理员提出进行改造,设计如图2的接待区所示。

中级网络工程师,真题专项训练,综合练习

问题1(13分)以下AC与S2交换机的部分配置,请补充完整。

要求AC与AP之间的vlan信息如下表所示。

中级网络工程师,真题专项训练,综合练习

配置S2

[Switch] sysname (1)[S2]vlan batch (2)[S2]interface GigabitEthernet0/0/1[S2-GigabitEthernet0/0/1]port link-type (3)[S2-GigabitEthernet0/0/1]port trunk(4) //设置默认vlan id 为100 [S2-GigabitEthernet0/0/1]port trunk (5) vlan 100 101 102 103[S2-GigabitEthernet0/0/1]quit[S2]interface GigabitEthernet0/0/2[S2-GigabitEthernet0/0/2]port link-typetrunk[S2-GigabitEthernet0/0/2]port trunkallow-pass vlan 100 101 102 103[S2-GigabitEthernet0/0/2]quit…[AC]vlan batch 100 101 102 103[AC](6)[AC-GigabitEthernet0/0/1]port link-typetrunk[AC-GigabitEthernet0/0/1]port trunkallow-pass(7)[AC-GigabitEthernet0/0/1]quit[AC]dhcp (8)[AC]interface (9)[AC -Vlanif100]ip address (10)[AC -Vlanif100]dhcp select (11)[AC-Vlanif100]quit[AC]interface vlanif 101[AC -Vlanif101]ip address (12)[AC -Vlanif101]dhcp select interface[ACVlanif101](13)[AC]…

正确答案及解析

正确答案
解析

(1)sysname S2 (2)vlan 100 to 103 或者 vlan 100 101 102 103(3)trunk(4)pvid vlan 100(5)allow-pass (6)interface GigabitEthernet0/0/1(7)vlan 100 to 103 或者 vlan 100 101 102 103(8)enable(9) Vlanif 100 (10)192.168.100.1 24 (11) interface (12) 192.168.101.1 24 (13) quit

【解析】

[Switch] sysname S2

你可能感兴趣的试题

单选题

Advancements in ( )have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.

  • A.Artificial Intelligence
  • B.Cloud Computing
  • C.Internet of Things
  • D.Big Data
查看答案
单选题

In project human resource management , ( )is not a source of power for the project manager.

  • A.referent power
  • B.expert power
  • C.reward power
  • D.audit power
查看答案
单选题

At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , ( ), operation environment feasibility analysis and other aspects of feasibility analysis.

  • A.detail feasibility analysis
  • B.opportunity analysis
  • C.economic feasibility analysis
  • D.risk analysis
查看答案
单选题

( )is a grid that shows the project resources assigned to each work package.

  • A.Stakeholder engagement assessment matrix
  • B.Requirements traceability matrix
  • C.Probability and impact matrix
  • D.Responsibility assignment matrix
查看答案
单选题

Xinhua News Agency reported in January 2022,Chian will further promote the developmet of a digital economy during the 14th Five-Year Plan eriod(2021-2025). The plan also emphasized industrial ( )transformation.

  • A.digital
  • B.networking
  • C.intelligentize
  • D.informatization