Many of the activities performed during the preliminary investigation are still being conducted in( ), but in much greater depth than before. During this phase, the analyst must become fully aware of the ( )and must develop enough knowledge about the ( ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the ( )for process and data of current system, the deliverable from this phase also includes the (5)for the proposed system.
(5)应选( )。
- A.hardware and software specification
- B.system performance specification
- C.formal requirements definition
- D.general problem statement
正确答案及解析
正确答案
解析
本题考查的是初步调研的相关知识,这个考点可以做个了解。经常考初步调研阶段的许多活动在分析阶段仍然要继续,而且会比以前更深入许多。在分析阶段,分析师必须要完全清楚最终蓝图并且掌握充分的业务环境和目前系统的商业环境,以使一个有效的解决方案被提出并且执行。除了当前系统的过程和数据的逻辑模型,这一阶段的产出物还包括建议系统的正式需求定义。
75、A、软硬件说明,B、系统性能说明,C、正式需求定义,D、一般问题说明
包含此试题的试卷
你可能感兴趣的试题
根据你理解请用100字以内文字说明嵌入式系统主要特点。
- 查看答案
某项目有 A~H 八个作业,各作业所需时间(单位:周)以及紧前作业如下表
该项目工期为( )周。如果作业C 拖延3 周完成,则该项目工期(请作答此空)
-
- A.不变
- B.拖延1周
- C.拖延2周
- D.拖延3周
- 查看答案
需求管理是一个对系统需求变更、了解和控制过程。以下活动中,( )不属于需求管理主要活动。
-
- A.文档管理
- B.需求跟踪
- C.版本控制
- D.变更控制
- 查看答案
文档是影响软件可维护性决定因素。软件系统文档可以分为用户文档和系统文档两类。其中,( )不属于用户文档包括内容。
-
- A.系统设计
- B.版本说明
- C.安装手册
- D.参考手册
- 查看答案
下面关于变更控制描述中,()是不正确。
-
- A.变更控制委员会只可以由一个小组担任
- B.控制需求变更与项目其他配置管理决策有着密切联系
- C.变更控制过程中可以使用相应自动辅助工具
- D.变更过程中,允许拒绝变更
- 查看答案